painting_logo

On Time, On Budget, With Peace of Mind

Interior Painting & Renovations

Ramada Granville

LOCATION: 1221 Granville Street, Vancouver

DESCRIPTION: Exterior Revamp, interior lobby and some guest rooms

DURATION: 3 Months

PROJECT SCOPE: Exterior: Full envelope rehab, caulking, painting, installation of new stucco, installation of new roof and addition of a roof deck, lead abatement, installation of new awnings.

Interior: Demolition, Plumbing, Electrical, New Drywall, Installation of new Carpet and Wallcovering, Installation of New Tile, Millwork, and Painting.  Full renovation of the public washrooms while adding additional stalls and creating an accessible washroom.

UNIQUE FEATURE: This building is 100 years old! Being an old building this hotel had its own set of unique challenges once demolition had begun

Fairmount Airport Hotel

LOCATION:  3111 Grant McConachie Way, Richmond

DESCRIPTION: 385 rooms, corridors, and Gold Floor.

DURATION: 3 Months – Gold Floor & 6 months – 348 rooms

PROJECT SCOPE: Guest and Corridor upgrades including:

Demolition, Skim Coating and New Drywall, Installation of new Carpet and Wallcovering, Installation of New hardwood floors, Millwork, and Painting

UNIQUE FEATURE: This hotel is very busy so timelines were tight and finishing had to be at the highest quality.  With many gorgeous design elements this project is one of the jobs we are most proud of

Four Seasons Hotel

LOCATION: Downtown Vancouver, BC

DESCRIPTION: Interior Renovations

DURATION: 7 months

PROJECT SCOPE: Complete interior upgrade, including guest rooms, guest hallways and meeting rooms. 389 rooms and all corridors renovated

UNIQUE FEATURES: Due to the luxury standards of the Four Seasons, this project required a precise level 5 finish to all textured ceilings. We completed this project with an on-time hand over of every floor, one each Friday at 4PM until completion.

Holiday Inn Metrotown

LOCATION: 4405 Central Blvd, Burnaby

DESCRIPTION: Interior Renovations

DURATION: 2 months

PROJECT SCOPE: Full lobby demolition and new renovation as well as great room and breakfast buffet area renovations

UNIQUEFEATURE: Due to brand standards, hotels must update their guest spaces to meet certain requirements, and Prostar is proud to have given this hotel not only one new lobby in 2015, but a second new lobby in 2019.

Crystal Lodge

LOCATION: 4154 Village Green, Whistler

DESCRIPTION: Interior Renovations

DURATION: 8 weeks

PROJECT SCOPE: Guest room upgrades including complete bathroom renovation and guest suite wall coverings in 83 rooms. AC units installed in guest suites from the exterior

UNIQUE FEATURE : Very tight timeline (more than 10 rooms completed per week with a large scope). Room and washroom upgrades including a wide array of Prostar staff: tilers, painters, wall covering installers, electricians, plumbers, HVAC installers and hotel staff to accommodate the tight schedule. Working with the building inspectors of Whistler to upgrade this aged hotel to meet modern building code.

Westin Bayshore Hotel Coffee Shop

LOCATION: 1601 Bayshore Dr., Vancouver

DESCRIPTION: Interior Renovations

DURATION: 2 months

PROJECT SCOPE: Complete renovation of a storage room to a beautifully designed coffee shop inside the hotel’s main lobby.  The design was implemented by Liv Design Studio whose office is also located within the hotel. Including in this renovation wastile flooring, electrical work, cabinet & counter installation, various design elements and interior painting. A second project was completed later in the year which was a full conversion of an unused pop-up space into a beautiful yoga studio looking out onto the hotel’s courtyard and pool

UNIQUE FEATURES: Both of these projects were completed during regular hotel operations. The coffee shop’s unique design required many hands-on deck and a strict working schedule to be able to turn over within the allocated time frame.

Holiday Inn Vancouver Centre

LOCATION: 711 West Broadway, Vancouver

DESCRIPTION: Interior Renovations and Exterior Envelope

DURATION: 7 Months

PROJECT SCOPE: Complete interior upgrade including guest rooms and hallways, all ballrooms, lobbies, meeting rooms and restaurant / lounge as well as complete exterior concrete restoration and painting

UNIQUE FEATURE: All textured ceilings skim coated to a level 5 smooth finish. Working alongside electricians & plumbers as the building was refurbished for sprinklers and new fire alarm system. Renovation of lobby while hotel continued operations.

The Cultch

LOCATION: 1984 Venables St, Vancouver

DESCRIPTION: Main Floor Washrooms Renovation

PROJECT SCOPE: Demo of existing washrooms including plumbing, installation of supple piping, plumbing fixtures, vanity, mirrors, tile work, painting, and installation to new fire suppression sprinklers.

Metropolitan Towers

LOCATION: 930 & 980 Seymour St, Vancouver

DESCRIPTION: Rental Suite Turnover

PROJECT SCOPE: Complete in-suite repainting, flooring replacement, plumbing fixture replacement, bathroom & kitchen sink replacement, kitchen backsplash installation, cabinet re-finishing, in suite closet and room door replacement, remove and replace bathroom trim, appliance removal and installation.

Caviar Skin Clinic

LOCATION: 1076 Hamilton St, Vancouver

DESCRIPTION: Interior Renovations

PROJECT SCOPE: Full renovation of existing medical space into brand new skin care clinic including new lobby area, patient rooms, flooring, wall finishings, additional plumbing and electrical.

 

889 Homer

LOCATION: 889 Homer St, Vancouver

DESCRIPTION: Main Lobby Renovation

PROJECT SCOPE: Installation of new tile, accent features, FF&E install, new lighting, installation of new intercom system and automatic door opener, and repainting.

Beanworks

LOCATION: 1149 – 1159 Hamilton St, Vancouver

DESCRIPTION: Interior Renovations

PROJECT SCOPE: Complete tenant improvements including installation of all plumbing, electrical, addition of partition walls, glass partition walls, fire suppression sprinklers, vinyl and carpet tile installation, concrete sealing, and interior painting.

Prostar Office

LOCATION: 6741 Cariboo Rd, Burnaby

DESCRIPTION: Interior Renovations

PROJECT SCOPE: Complete tenant improvements including installation of all plumbing, electrical, HVAC, addition of offices and partition walls, fire suppression sprinklers, vinyl and carpet tiling, & FF&E installation.

Earls Bridge Park

LOCATION: 3850 Lougheed Hwy, Burnaby

DESCRIPTION: Dining Room Painting & Kitchen Upgrades

PROJECT SCOPE: Repaint entire dining room area (walls & ceilings), remove and replace existing kitchen tile, kitchen drywall replacement, mold resistant tile backer installation, install FRP panels, install new PVC baseboards.

Grand Corniche

LOCATION: 6220 – 6240 Mckay Ave, Burnaby

DESCRIPTION: Common Corridor Renovation

PROJECT SCOPE: Installation of new underlay and common corridor carpeting, new wall coverings, painting of ceilings, replacement of interior lighting, repair and reinstate water fountain.

The Savoy

LOCATION: 928 Richards St, Vancouver

DESCRIPTION: Pool, Sauna, Lobby, and Common Washroom Renovation

PROJECT SCOPE: Painting of lobby walls, ceiling and doors, new tiling, new crown molding, new lobby lighting, new lobby/P1 level vinyl wall covering, new elevator and level P1 tiling. Paint walls and and ceilings in pool area with moisture resistant paint, installation of new waterproofing and anti-fracture membrane in all pool/sauna tile areas, new shower pans in washrooms.

Meridian

LOCATION: 910 Beach Ave, Vancouver

DESCRIPTION: Interior Hallway Renovations

PROJECT SCOPE: Replacement of all common hallway carpeting and wallcoverings.

Montecito Towers

LOCATION: 7360 & 7376 Halifax St, Burnaby

DESCRIPTION: Rental Suite Turnover

PROJECT SCOPE: Several rental suite turnovers which included flooring removal and replacement, electrical upgrades, in-suite plumbing system upgrades, new plumbing fixtures, new paint, new in-suite doors and hardware.

 

Progressive Automations

LOCATION: 6691 Elmbridge Way, Richmond

DESCRIPTION: Interior Renovations

PROJECT SCOPE: Full renovation of an empty warehouse into a brand new office including workstations, flooring, glass office dividers, kitchen, and additional plumbing and electrical.